Mineral Resource Estimate
The Mineral Resource Estimate presented in Table 3 was prepared by Independent Qualified Person Glen Kuntz, P. Geo., of Nordmin. The Mineral Resource Estimate is based on validated results of 681 surface and underground drill holes for a total of 121,540 metres of diamond drilling completed between 1984 and the effective date of November 15, 2021, including 55,803 metres conducted by Anaconda.
Table 3: Mineral Resource Estimate for the Goldboro Gold Project – Effective Date November 15, 2021
Resource Type
|
Gold Cut-off (g/t gold)
|
Category
|
Tonnes
|
Grade
(g/t gold)
|
Gold Troy Ounces
|
Open Pit
|
0.45
|
Measured
|
7,680,000
|
2.76
|
681,000
|
Indicated
|
7,988,000
|
2.89
|
741,000
|
Measured + Indicated
|
15,668,000
|
2.82
|
1,422,000
|
Inferred
|
975,000
|
2.11
|
66,000
|
Underground
|
2.40
|
Measured
|
1,576,000
|
7.45
|
377,000
|
Indicated
|
4,350,000
|
5.59
|
782,000
|
Measured + Indicated
|
5,925,000
|
6.09
|
1,159,000
|
Inferred
|
2,206,000
|
5.89
|
418,000
|
Combined Open Pit and Underground*
|
0.45
and
2.40
|
Measured
|
9,255,000
|
3.56
|
1,058,000
|
Indicated
|
12,338,000
|
3.84
|
1,523,000
|
Measured + Indicated
|
21,593,000
|
3.72
|
2,581,000
|
Inferred
|
3,181,000
|
4.73
|
484,000
|
* Combined Open Pit and Underground Mineral Resources; The Open Pit Mineral Resource is based on a 0.45 g/t gold cut-off grade, and the Underground Mineral Resource is based on 2.40 g/t gold cut-off grade.
Mineral Resource Estimate Notes
- Mineral Resources were prepared in accordance with NI 43-101 and the CIM Definition Standards for Mineral Resources and Mineral Reserves (2014) and the CIM Estimation of Mineral Resources and Mineral Reserves Best Practice Guidelines (2019). Mineral Resources that are not mineral reserves do not have demonstrated economic viability. This estimate of Mineral Resources may be materially affected by environmental, permitting, legal, title, taxation, sociopolitical, marketing, or other relevant issues.
- Mineral Resources are inclusive of Mineral Reserves.
- Open Pit Mineral Resources are reported at a cut-off grade of 0.45 g/t gold that is based on a gold price of C$2,000/oz (~US$1,600/oz) and a metallurgical recovery factor of 89% around cut-off as calculated from ((GRADE-(0.0262*LN(GRADE)+0.0712))/GRADE*100)-0.083.
- Underground Mineral Resource is reported at a cut-off grade of 2.60 g/t gold that is based on a gold price of C$2,000/oz (~US$1,600/oz) and a gold processing recovery factor of 97%.
- Assays were variably capped on a wireframe-by-wireframe basis.
- Specific gravity was applied using weighted averages to each individual wireframe.
- Effective date of the Mineral Resource Estimate is November 15, 2021.
- All figures are rounded to reflect the relative accuracy of the estimates and totals may not add correctly.
- Excludes unclassified mineralization located within mined out areas.
Reported from within a mineralization envelope accounting for mineral continuity.
Mineral Reserve Estimate
The Mineral Reserve Estimate presented in Table 2 was prepared by Independent Qualified Person Joanne Robinson, P.Eng., of Nordmin.
Table 2: Mineral Reserve Statement for the Goldboro Gold Project – Effective Date of December 15, 2021
Category
|
Area
|
Cut-off Grade
(g/t gold)
|
Tonnes (t)
|
Diluted
Grade
(g/t gold)
|
Contained Gold Metal (Troy ounces)
|
Probable Mineral Reserve
|
East Pit
|
0.45 g/t
|
5,468,300
|
2.54
|
446,000
|
Probable Mineral Reserve
|
West Pit
|
0.45 g/t
|
10,330,600
|
2.12
|
704,200
|
|
Total
|
0.45 g/t
|
15,798,900
|
2.26
|
1,150,200
|
Mineral Resource Estimate Notes
- Mineral Resources were prepared in accordance with NI 43-101 and the CIM Definition Standards for Mineral Resources and Mineral Reserves (2014) and the CIM Estimation of Mineral Resources and Mineral Reserves Best Practice Guidelines (2019). Mineral Resources that are not mineral reserves do not have demonstrated economic viability. This estimate of Mineral Resources may be materially affected by environmental, permitting, legal, title, taxation, sociopolitical, marketing, or other relevant issues.
- Mineral Resources are inclusive of Mineral Reserves.
- Open Pit Mineral Resources are reported at a cut-off grade of 0.45 g/t gold that is based on a gold price of C$2,000/oz (~US$1,600/oz) and a metallurgical recovery factor of 89% around cut-off as calculated from ((GRADE-(0.0262*LN(GRADE)+0.0712))/GRADE*100)-0.083.
- Underground Mineral Resource is reported at a cut-off grade of 2.60 g/t gold that is based on a gold price of C$2,000/oz (~US$1,600/oz) and a gold processing recovery factor of 97%.
- Assays were variably capped on a wireframe-by-wireframe basis.
- Specific gravity was applied using weighted averages to each individual wireframe.
- Effective date of the Mineral Resource Estimate is November 15, 2021.
- All figures are rounded to reflect the relative accuracy of the estimates and totals may not add correctly.
- Excludes unclassified mineralization located within mined out areas.
Reported from within a mineralization envelope accounting for mineral continuity.